Task_World130_CamilleMoingeon_4
Management Consulting Document / Contract AnalysisPrompt
Can you look at the Frito-Lay case study and apply their downtime reduction to HarFeast Good Group's number in the baseline file? I want to estimate what the improvement would look like for us (rounded to the nearest full percentage point). Output the information in a message here.
Files
No task input snapshot for this task (`task_input_files` is null).
Gold Response
Assuming HarFeast Food Group attained the same results as Frito-Lay's, the new unplanned downtime ratio for each of the 5 plants would be as follows: - Rockford, Illinois plant: 14% - Madison, Wisconsin plant: 14% - Cedar Rapids, Iowa plant: 13% - Toledo, Ohio plant: 14% - Kalamazoo, Michigan plant: 15%
Rubric (5 criteria)
5 criteria
Traces (0)
No traces for this task
Input Analysis
- Prompt
- 48 words - 283 chars
- ~62 tokens
- Structure
- 3 sentences - 1 questions
- Ref. Files
- 1 files
- 1 pdf
Output Analysis
- Output Type
- Message In Console
- Response
- text - 51 words - 7 lines
- ~66 tokens
- Prompt Tokens
- 63
- Gold Tokens
- 67
- Total Tokens
- 226
- Rubric
- 5 criteria